Tuesday, March 26, 2024

Reliant Building Solutions Builds HVAC Equipment Rack within Operating Room

Reliant Building Solutions has completed the HVAC equipment rack inside the Operating Room of an Atlanta area hospital.  Once the footings were poured, we installed four steel columns and cross beams to create a rack for the HVAC equipment that will service the OR.  After we installed all the steel, the HVAC equipment was placed on top.  The photo shows the holes cut in the slab, the columns in the footings and the equipment sitting on top.

Let's Get To Work.
Give us a call to get started
Let's Connect
Let's Talk.
White version of our logo
770.403.3508
White version of our logo
info@rbsga.com
White version of our logo
7550 Industrial Court,
Alpharetta, GA  30004
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
News
Precision Steel Work
Precision Steel Work
Read
Carbon Fiber Strengthening
Carbon Fiber Strengthening
Read
Concrete Slab Openings
Concrete Slab Openings
Read
Springtime Means Outdoor Work
Springtime Means Outdoor Work
Read